Every Lumera deployment starts from the same questions: what does the load look like, what does the tariff punish, and what happens when the grid blinks? The configuration follows from the answers.
AI-era loads ramp faster than utility infrastructure. Grid-forming storage bridges utility delays, shaves coincident peaks and provides seamless backup for critical halls — with the voltage-source behavior that keeps sensitive power electronics stable during disturbances.
Typical fit: P450 AC blocks, front or behind the meter.
Demand charges and unplanned stops dominate the industrial power bill. Storage flattens the peaks, rides through sags that would trip a line, and — paired with rooftop solar — raises self-consumption across the park.
Typical fit: 261 kWh cabinets in parallel, or P450 blocks for large plants.
Fleet electrification lands on sites whose service was never sized for it. Storage buffers depot charging, defers service upgrades, and shifts energy into off-peak windows — while three-phase four-wire output handles the site's mixed single-phase loads.
Typical fit: LMR-P135 systems at 480 V, 3P4W.
Solar-plus-storage, backup for critical circuits and tariff optimization for campuses, retail, cold storage and agriculture. Grid-forming capability means the same asset that saves money on weekdays keeps the lights on during outages.
Typical fit: 135 kW / 261 kWh cabinets, scalable in parallel.
Load data, tariff and interconnection review — we size to the actual peak window, not a rule of thumb.
PCS class, cabinet count or block size, and the FEOC / certification file your incentive claim needs.
Factory-integrated systems, tested before they ship, with documentation for AHJ review.
Commissioning support and U.S.-based technical service for the life of the system.
Fifteen minutes of interval data is enough for a first configuration and savings estimate.